Puddling Clay

Please Note that due to the nature of this product all weights are given as an approximation. 

In years gone by ponds have been formed using sheep fenced on the the area using the action of the sheeps feet tredging round and round which has puddled the clay in to position. Nowadays large rolling machines are used but the rollers are still called sheeps feet.

Puddling clay comes from a local source and is used by British Waterways for lining all there canals, it comes already hydrated and ready to use. The puddling clay is like putty which can be applied manually or mechanically.

We recommend a depth of 200 – 300mm depending on the size of the pool you are forming of puddling clay to form a impermeable barrier to keep your water in the pool.

Here is a caption from Valarie Porters book The Pond Book clearly describing the ways used in the past and present.

Puddling is used in maintaining canals or reservoirs on permeable ground. The technique of puddling and its use was developed by early canal engineer James Brindley; it is considered his greatest contribution to engineering.

 This processed material was used extensively in UK canal construction in the period starting circa 1780. Starting about 1840 puddle clay was used more widely as the water-retaining element (or core) within earth fill dams, particularly in the Pennines. Its usage in UK dams was superseded about 1960 by the use of rolled clay in the core, and better control of moisture content.

A considerable number of early notable dams were built in that era and they are now sometimes referred to as the 'Pennines embankment' type. These dams are characterized by a slender vertical puddle clay core supported on both sides by earthfill shoulders of more heterogeneous material. To control under-seepage through the natural foundation below the dam, the Pennines embankments generally constructed a puddle clay-filled cutoff trench in rock directly below the central core. Later construction often used concrete to fill the cutoff trench.

To make puddle, clay or heavy loam is chopped with a spade and mixed into a plastic state with water and sometimes coarse sand or grit to discourage excavation by moles or water voles. The puddle is laid about 10 inches (25 cm) thick at the sides and nearly 3 ft (0.91 m) thick at the bottom of a canal, built up in layers. Puddle has to be kept wet in order to remain waterproof so it is important for canals to be kept filled with water.

The clay is laid down with a tool called a 'punner', or 'pun', a large rectangular block on a handle about 5 feet (1.5 m) long, or trodden down, or compacted by some other means (e.g. by an excavator using the convex outside of its scoop, or, historically, by driving cattle across the area).

Mr A.E.Woodfield

Woodfields Topsoil

Closes Farm

Turlowfields Lane

Ashbourne

Derbyshire

DE6 1PZ

Please use the contact us page if you wish to contact us via e-mail 

Tel: 01335 372 728

 

VAT No: 273 0639 60

 

CONTACT US

Post Codes:

Woodfields reserve the right to cancel any order which is not included in normal shipping terms IE: Postal codes within the following: AB,IV,KW,TR,PA,PH, ALL HIGHLANDS / SCOTTISH ISLANDS & ANY OTHER OFFSHORE

Returns

If for any reason you wish to return your goods within 14 days of date of delivery please notify us immediately (or as soon as possible) , and you will be given instruction on how to return the item. All postage costs needs to be paid for by the customer. We have a no quibble policy and will make returning your goods as easy as possible.

  • White Facebook Icon
  • White Twitter Icon
  • White Instagram Icon

© 2016 by Woodfields Topsoil Proudly created by SJWebs.

OPENING HOURS
 
MON-FRI 8am-5pm
SATURDAY 9am-1pm
We are closed on Public Bank Holidays and Sundays